4 Boiler Projects 5
8
Sinopec Zhenhai CFBC Boiler Island Project, Ningbo, P.R.C.

IDS, Engineering Subcontractor to Foster Wheeler Energy Corporation for two (2) new 220 tons/hr Foster Wheeler CFBC boilers, located in Ningbo, Peoples Republic of China.

IDS has provided Plant Design, Stress Engineering and Design/Drafting support on several supporting systems for the Zhenhai project.  Areas of technical support include the design and engineering of the Plant General Arrangement layout and design, equipment interference checking, Air Heater design, Primary & Secondary Combustion Air ducting systems, Flue Gas ducting system, Ash Hopper design and all associated load calculations, duct support design and platework stiffening.

IDS has also provided FWEC with in office Plant Design support throughout the design phase of the project.  IDS personnel coordinated with the project team to develop the Plant 3-D Models and project General Arrangement drawings and documentation.

Turow Power Station, Bogatynia, Poland
IDS, Engineering Subcontractor to Foster Wheeler Energy Corporation for the  installation of three (3) 230 MWe each, Foster Wheeler Pyropower CFBC Boiler Units, located in Bogatynia, Poland.

IDS is providing project support in the areas of Plant Design, Stress Engineering and Design/Drafting on various supporting systems for the Turow project.  Areas of technical support include; Boiler Feedwater and Steam Circulation piping,    Interconnecting piping, Main Steam piping, balance of plant piping, Steam Blow piping and all associated support design and detailing.  Also, mechanical system design and engineering including, Fuel Feed, Limestone, Combustion Air ducting, Flue Gas ducting, Ash handling and all associated load calculations, thermal    expansion movements and support designs.

IDS also providing on site engineering and design support at the Turow job site during the construction phase of the project.  IDS personnel are assisting the construction management team with, developing As-Built documentation, plant walkdowns of mechanical equipment, field routing and design of small bore piping systems such as; Spraywater piping, Sootblower piping, Vent & Drain piping, field design and engineering recommendations, equipment interference checking, construction deviation report tracking, scheduling and document control.